cats:settings:productionsettings

Production Settings
Production Settings Interface Tab

Production Estimates

Allow entry of estimated production amounts. -
Start in estimate mode when:on contract -

Percentage Yields

Allow entry of percentage yields for outputs -
Use yields for outputs by default (rather than amounts) -

Next Production ID -

Production Settings Conversion Tab

Require bank to release (for inputs) before contract -
Require delivery order (for inputs) before contract -
Include conversion costs in the price of the output material -
Include additional costs in the price of the output material -

Default Contract Details: -
Purchase -
Traffic location -
Account -
Contract Terms -

Production invoice details: -
General ledger number -
Invoice cost code -

  • cats/settings/productionsettings.txt
  • Last modified: 2017/12/19 03:21
  • by 127.0.0.1