cats:procedures:production:createproduction

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
cats:procedures:production:createproduction [2018/11/13 17:33] – [Generating the Output Contract] jencats:procedures:production:createproduction [2018/11/13 17:38] (current) – [Generating the Output Contract] jen
Line 87: Line 87:
 Clicking on the link to the output contract we can see the newly generated contract.  Clicking on the link to the output contract we can see the newly generated contract. 
  
-[{{:cats:procedures:production:contract_screen.png?800|The output contract itself.}}]+[{{:cats:procedures:production:production_newcontract.png?|The output contract itself}}]
  
 Note that the material shows up as //Charged//. (CATS will also mark the material as in warehouse.) You can begin working with this output material immediately in CATS.  Note that the material shows up as //Charged//. (CATS will also mark the material as in warehouse.) You can begin working with this output material immediately in CATS. 
Line 93: Line 93:
 Meanwhile, the material we used for input has been moved out of inventory completely. Meanwhile, the material we used for input has been moved out of inventory completely.
  
-[{{:cats:procedures:production:original_purchase.png?800|The original input contract showing 50MT has moved out of inventory.}}]+[{{:cats:procedures:production:production_inputcontract.png?|The original input contract}}]
  
 ==== Adjusting the Batch ==== ==== Adjusting the Batch ====
  • cats/procedures/production/createproduction.1542130397.txt.gz
  • Last modified: 2018/11/13 17:33
  • by jen