cats:procedures:productiondocs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
cats:procedures:productiondocs [2019/03/26 16:03] jencats:procedures:productiondocs [2019/03/26 16:21] (current) jen
Line 9: Line 9:
  
 Enter the Purchase Contract Number for the output material. This can be a new contract number, which will close out the original purchase (input) contract and create a new purchase contract. You can also use an existing purchase contract number to place material on an existing contract as a new contract item.  Enter the Purchase Contract Number for the output material. This can be a new contract number, which will close out the original purchase (input) contract and create a new purchase contract. You can also use an existing purchase contract number to place material on an existing contract as a new contract item. 
-Enter the account and shipment terms for this document.+Enter the account and shipment terms for this document. Choose **Save** to continue. (Cancel will undo changes and cancel the new production)
 [{{:cats:procedures:production_choosecontract_001.png?|Enter contract number, account and terms}}] [{{:cats:procedures:production_choosecontract_001.png?|Enter contract number, account and terms}}]
- +The production request has been created. You can choose **Edit** if you need to modify any information.
-Choose **Save** to continue(Cancel will undo changes and cancel the new production) +
 [{{:cats:procedures:production_saveproduction.png?|}}] [{{:cats:procedures:production_saveproduction.png?|}}]
- +For more information on entering a  new batch, see wiki  
 +[[cats:procedures:production:createproduction|Using Production to Convert Material]]
  
  
  • cats/procedures/productiondocs.1553616201.txt.gz
  • Last modified: 2019/03/26 16:03
  • by jen