Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
cats:procedures:productiondocs [2019/03/26 16:03] – jen | cats:procedures:productiondocs [2019/03/26 16:21] (current) – jen | ||
---|---|---|---|
Line 9: | Line 9: | ||
Enter the Purchase Contract Number for the output material. This can be a new contract number, which will close out the original purchase (input) contract and create a new purchase contract. You can also use an existing purchase contract number to place material on an existing contract as a new contract item. | Enter the Purchase Contract Number for the output material. This can be a new contract number, which will close out the original purchase (input) contract and create a new purchase contract. You can also use an existing purchase contract number to place material on an existing contract as a new contract item. | ||
- | Enter the account and shipment terms for this document. | + | Enter the account and shipment terms for this document. |
[{{: | [{{: | ||
- | + | The production request has been created. You can choose | |
- | Choose | + | |
[{{: | [{{: | ||
- | + | For more information on entering a new batch, see wiki | |
+ | [[cats: | ||